Checklist: UAV Lidar & Photogrammetry mapping
Contents
Mission details
Mission type:
- Topographic mapping
- Corridor mapping
- Volumetric analysis
- 3D modeling
- Infrastructure inspection
- Other: _________________
Platform type: _______________________________________________
PRE-FLIGHT CHECKS
Mission planning
- Weather conditions verified (wind < ___ knots, no precipitation)
- Flight area map reviewed & waypoints programmed
- Takeoff and landing site identified and secured
- Airspace restrictions checked (altitude limits)
- Ground control points (GCPs) layout verified
- Safety zones established
Mission parameters
- Flight altitude set for required GSD: _____ cm/px
- Forward/side overlap configured: _____% / _____%
- Flight lines planned and verified
- Camera/Lidar settings optimized for conditions
- Projected flight time: _____ minutes
- Battery reserve margin: _____% (at least 20%)
Sensor configuration
Lidar system:
- Scanner alignment verified
- IMU/GNSS connection stable
- Point density requirements confirmed
- Scan angle/pattern configured
Photogrammetry system:
- Camera calibrated (known calibration parameters)
- Focal length/aperture optimized
- Shutter speed appropriate for flight speed
- ISO settings optimized for lighting
RISK ASSESSMENT
GREEN 0 – 23 = Low (Pilot in training w/ mentor)
AMBER 24 – 44 = Caution (Trained Pilot)
RED 45 – 60 = High Risk (Seasoned Pilot or No Go)
1 = Best case | 10 = Worst case
| Category | Rating |
|---|---|
| Supervision | 1 2 3 4 5 6 7 8 9 10 |
| Planning | 1 2 3 4 5 6 7 8 9 10 |
| Pilot Selection | 1 2 3 4 5 6 7 8 9 10 |
| Environment | 1 2 3 4 5 6 7 8 9 10 |
| Equipment | 1 2 3 4 5 6 7 8 9 10 |
| Mission Complexity | 1 2 3 4 5 6 7 8 9 10 |
Total score: ____________
UAV PREFLIGHT CHECKLIST
Power systems
- Check general condition of UAV for damage
- Inspect propellers for cracks/wear
- UAV batteries fully charged
- Insert UAV battery
- Ground station/tablet batteries charged
- Transmitter batteries charged
- Total battery reserve time noted: _____ minutes
Systems integration
- Lidar/camera securely mounted and aligned
- Sensor power connections verified
- Data storage media formatted and inserted
- UAV on level ground away from metal objects
- All systems power up correctly
- Stable connectivity between all devices
- Latest firmware versions confirmed
Calibration & testing
- IMU calibration completed
- GNSS receiver acquiring satellites
- Gimbal stabilization test
- Sensor operational test
- Controller stick response test
- GPS lock confirmed (> 7-10 satellites)
- Flight spotter briefed and positioned
🎥 Sensor-specific checks
Lidar:
- Scanner initialization successful
- IMU data streaming confirmed
- Point cloud preview available
- System time synchronization verified
Photogrammetry:
- Camera focus set to infinity/manual
- Image format set to RAW/JPG
- Intervalometer/trigger timing tested
- Lens clean and free of debris
IN-FLIGHT CHECKS
- Start mission timer
- Power on all sensor systems
- Update home point
- Take off to safe altitude
- Hold hover for system verification
- Perform sensor functionality check
- Verify data recording/streaming
- Begin mission flight lines
- Monitor sensor performance every 2-3 minutes
- Verify complete area coverage
- Mission parameters maintained
POST-FLIGHT CHECKS
Immediate actions
- Power down sensor systems
- Power down UAV
- Power down transmitter
- Inspect UAV for damage
- Download sensor data
- Verify data integrity and completeness
Data management
- Create backup of raw data
- Verify image/Lidar data quality
- Check for coverage gaps
- Document flight conditions and parameters
- Transfer data to processing workstation
Equipment maintenance
- Clean sensor lenses/windows
- Charge UAV, transmitter, and ground station batteries
- Store UAV and sensors properly
- Complete flight log and mission report
- Schedule data processing workflow
DATA QUALITY VERIFICATION
- Required ground coverage achieved
- Image sharpness/GSD verified
- Lidar point density meets specifications
- No systematic errors detected
- Next mission requirements assessed
Mission success: [ ] Complete [ ] Partial [ ] Failed
Data quality: [ ] Excellent [ ] Good [ ] Acceptable [ ] Poor
Pilot Signature: _________________________
VO Signature: _________________________
Date: _________________________
Subscribe and receive updates, lessons, courses and more. No spam!
Get the latest updates and tips.